New Mission Campus
1125 Valencia St.
San Francisco, CA
The new CCSF Mission campus is composed of two existing 4-story concrete beam/slab shear wall buildings and two newer buildings. For this joint-venture partnership, STRUCTUS was commissioned for the seismic upgrade of the two existing 35,000 sq.ft. buildings and the structural design of a new 19,000 sq.ft. 4-story steel braced frame/ductile moment frame structure.
Architect: Kendall Young Associates
Square Footage: 89,000
Stories: 4
Year Completed: 2006